Building Update 12/29/23: Second floor poured and walls up!
On December 4th, the second floor of "Faith Home" was poured after all the logistics finally worked out for the cement truck and pump to come down a makeshift dirt road through the woods! (The hose/conduit carrying the cement from the truck extended over 100 yards!) As of the end of December, almost all of the walls are up on the first and second floor, and the roof should be delivered in the next few weeks!